Electrical installation Method Statement

By: njg

Our Installation of electrical services method statement example has been updated with the with BS7671 Amendment 3

  • Installation of Electrical cables and associated items to be installed throughout building to the
  • specified location of the wiring drawings in accordance with Part P of the building regulations
  • which also incorporates IEE wiring regulations.
  • Regulation 421.1.201, 1st January 2016. Consumer units and similar switchgear assemblies will
  • need to comply with BS EN 61439-3 and have their enclosure manufactured from non-combustible
  • material or enclosed in a cabinet or enclosure constructed of non-combustible material and comply
  • with Regulation 132.12.
  • CLICK HERE TO PURCHASE

  • About the Author:

    MIET


    This Article is Brought to you by:

    Building and Construction Method Statements and Risk Assessments


    Method Statement Template Related Articles:

    Method Statements and Risk Assessments Price Reduction

    Our Prices for completed example Method Statements and Risk Assessments have been reduced from 8.99 to 5.99. ...

    By: NJG

    Electrical installation Method Statement

    Our Installation of electrical services method statement example has been updated with the with BS7671 Amendment 3 Installation of Electrical cables and associated items to be installed throughout building to the ...

    By: njg

    Method Statement Installation of domestic central heating system

      ...

    By: Admin

    Updated Health and Safety Related News:


    More Resources: